On floating wind farm installation projects, support vessels work alongside a large installation vessel to carry out the station-keeping and hookup of a floating turbine.
In Shoreline Design, you can model this scenario using an HLV as the installation vessel and a feeder vessel as the support vessel.
You will need a case set up with a base, WTGs, an HLV, and a feeder vessel.
Configure your HLV
- Click on the Build tab.
- Click on the Logistics tab.
- Click on your heavy lift vessel.
- Click on the Processes tab.
- Click on 5.0 - Working with feeder.
- Set a Duration that meets the time required for station-keeping, i.e., anchoring and mooring, operations (~11 hours).
- Click on 6.0 - Install component.
- Set a Duration that meets the time required for hookup operations (~32 hours).
- Click Save.
Configure your feeder vessel
- Click on the Build tab.
- Click on the Logistics tab.
- Click on your feeder vessel.
- Click on the Processes tab.
- Set Duration values on 1.0 - Mobilization, 2.0 - Loadout, and 5.0 - Demobilization.
- Click Save.
Configure asset tasks
- Click on the Build tab.
- Click on the Assets tab.
- Click on your WTG assets.
- Click on the Tasks tab.
- Click + Add task.
- Enter the following details:
- Name: Hookup operation
- Task type:
Installation – Bottom Fixed: Feeder
- Logistics: Select the HLV you have configured for this purpose.
- Click + Add task.
- Enter the following details:
- Name:
Station-keeping operation
- Loadout base: Select the relevant base.
- Task type:
Feeder
- Dependent task:
Hookup operation
- Logistics: Select the feeder vessel you configured for this operation.
- Name: