This article contains information about the different inputs available for the Barge (HTV). For other transport inputs, please see Transportation input overview.
General information
Input label | Mandatory | Description |
---|
Name | x | The official name of the transportation |
Seat capacity | x | The capacity is the maximal number of Pax which can be transferred with the transportation |
Cruising speed (knots) | | The cruising speed define the maximal speed of the transportation in knots |
Type | x | The type defines the kind of transportation. Depending on the type, different input boxes are available |
Onshore port | x | The port is the harbour, airport or similar, used as the point of departure on the way to the base or as a base |
ID | | The ID is of unique value to identify the transportation |
Work package | | The transport can be assigned to a certain work package |
Current location
Input label | Mandatory | Description |
---|
Latitude | | The latitude where the transport is currently stationed |
Longitude | | The longitude where the transport is currently stationed |
Certificates
Input label | Mandatory | Description |
---|
Add certificate | | List of certificates that can be assigned to the transport, after which you can select the certificate's validity |
Certificate groups | | Automatically assigned, depending on the certificate selected, as certificates can be assigned to certificate groups |
Required skills
Input label | Mandatory | Description |
---|
Add required skills | | Qualification define which single or grouped qualification is necessary for every single technician to enter the transportation |
Required skill groups
Input label | Mandatory | Description |
---|
Add required skill groups | | Qualification define which grouped qualification is necessary for every single technician to enter the transportation |
Costs
Input label | Mandatory | Description |
---|
Cost of consumable per day offshore | | The cost of consumable per day offshore is the price for any consumables required for the personnel per day |
Day rate | | The day rate is the price of transportation per day |
Fuel costs | | The fuel costs are the price for every ton of fuel |
Mobilisation cost | | The mobilisation cost is the price per mobilisation |
Port fee | | The port fee is the price for the port per operation |
Fuel consumption
Input label | Mandatory | Description |
---|
Total fuel consumption per day | | The total fuel consumption per day is the averaged sum of fuel consumption per day |
Activity durations
Input label | Mandatory | Description |
---|
Mobilising time per port visit | | The mobilising time per port visit is the averaged time that the transportation needs to prepare in the port before leaving the port |
Demobilising time per port visit | | The demobilising time per port visit is the averaged time that the transportation needs to prepare in the port after arriving at the port
|