Changing work orders
If the planned time or the planned duration of a work order is wrong, it can be changed directly in the timeline. Select the work order by clicking on it. The following action depends on the positioning of the mouse cursor in the work orders.
When the mouse cursor is positioned in the middle of the work order, the mouse cursor is shown as an arrow cross. Clicking and holding onto the arrow cross makes it possible to move the work order in the timeline. This will not make the duration of the task change.
When the mouse cursor is positioned on one side of the work order, the mouse is shown as an arrow with a pointer on each end. Clicking and holding this arrow can change the length of the work order, the start time as well as the end time. Other times are not affected by the change.
Deleting work orders
The work order can be deleted from the plan by selecting the specific one in need of deleting. When doing this the work order will disappear from the list.
The whole plan can also be deleted, this will be described in the Using the tabs to clear and (un)dispatch the plan article.